Sidewalks

Current/Upcoming Sidewalk Work:
  • Roseland Terrace

The Longmeadow Public Works Department has contracted A. Pereira Construction Company to replace concrete sidewalks on Roseland Terrace.

The work is anticipated to begin on April 9th. Project completion is expected to be in May.

Lawn Sprinklers: In an effort to reduce damages to lawn irrigation systems, please mark irrigation lines and sprinkler heads located at the edge of the sidewalk, and within the tree belt. Flags to mark irrigation lines and heads are available at the Department of Public Works. Should there be any damage to the marked irrigation, the Town’s contractor will make the necessary repairs. The contractor will make every effort to avoid your irrigation systems. Damage to unmarked irrigation systems will not be repaired by the Town.

Following sidewalk installation, A. Pereira Construction will be placing screened topsoil and grass seed in disturbed areas. We ask that you assist with the process by providing water and additional grass seed (as deemed necessary) in order to accomplish successful lawn restorations.

In an effort to facilitate weekly refuse collection, residents are asked to have their refuse and recycling curbside by 7:00 a.m., especially during periods construction work is taking place on your street.

We will make every effort to notify residents of any substantial schedule changes.  Please check the Town Facebook page (facebook.com/LongmeadowMA) for current updates. Please report any problems or concerns by contacting the Engineering Department at (413) 567-3400.